No. |
Date Sent |
Date Rcvd |
Status |
Description |
| 002 |
03/12/08 |
03/17/08 |
Closed |
Please provide structural details... |
| 002R1 |
04/15/08 |
04/16/08 |
Closed |
Per the steel contractor, the roof... |
| 003 |
03/10/08 |
03/10/08 |
Closed |
Please provide dimensions not shown... |
| 004 |
03/10/08 |
03/17/08 |
Closed |
Please provide dimensions & specific locations... |
| 005 |
03/10/08 |
03/21/08 |
Closed |
Please clarify if the Delta 2... |
| 006 |
03/10/08 |
03/10/08 |
Closed |
Delta 2 drawings do not include P301. |
| 007
|
03/10/08 |
03/10/08 |
Closed |
Womens Restroom Dimension Clarification. |
| 008
|
03/10/08 |
03/21/08 |
Closed |
Fume Hood Fire Suppression Requirements. |
| 009
|
03/12/08 |
03/14/08 |
Closed |
Room # 2118, Future Room Dimensions... |
| 010
|
03/12/08 |
03/12/08 |
Closed |
Clarificatioin of frame types... |
| 011
|
03/14/08 |
03/14/08 |
Closed |
Rm #2118 for Future Use. |
| 012
|
03/14/08 |
03/21/08 |
Closed |
Rm # 2130B sprinkler line conflict... |
| 013
|
03/14/08 |
03/21/08 |
Closed |
Duct work/ceiling height conflict... |
| 014
|
03/14/08 |
03/21/08 |
Closed |
Rm #2106 @ column F1, dtl 20/A500. |
| 015
|
03/14/08 |
03/21/08 |
Closed |
Fur out at west wall, rm #2115... |
| 016
|
03/14/08 |
03/21/08 |
Closed |
Rm #2130B door opening locating... |
| 017
|
03/14/08 |
03/31/08 |
Closed |
Request for locating dimensions... |
| 018
|
03/19/08 |
03/21/08 |
Closed |
Locating dimension for entry... |
| 019
|
03/19/08 |
03/21/08 |
Closed |
Column’s on Grid #G5 & F5 have... |
| 019R1
|
03/24/08 |
03/28/08 |
Closed |
Clarification on PG’s answer... |
| 020
|
03/19/08 |
03/26/08 |
Closed |
Dtl. 9/A500 shows to wrap studs... |
| 021
|
03/19/08 |
03/21/08 |
Closed |
The overall drawing dimension... |
| 022
|
03/19/08 |
03/21/08 |
Closed |
Due to existing supply & waste/vent... |
| 023
|
03/19/08 |
03/21/08 |
Closed |
At the first floor entrance... |
| 024
|
03/21/08 |
03/21/08 |
Closed |
Please confirm that level 4... |
| 025
|
03/21/08 |
03/21/08 |
Closed |
Please confirm that R-11 is ... |
| 026
|
03/24/08 |
03/27/08 |
Closed |
There are a total of three... |
| 026R1
|
03/28/08 |
04/01/08 |
Closed |
What type of chair is to be ... |
| 027
|
03/24/08 |
04/02/08 |
Closed |
Question 1: is the SK-1 being... |
028
028 SK2
028 SK4
|
03/24/08 |
04/02/08 |
Closed |
Question 1: We have been told... |
| 029
|
03/26/08 |
03/27/08 |
Closed |
Please provide details or... |
| 030
|
03/26/08 |
03/26/08 |
Closed |
Per the Henry Schein representatives... |
031
031 SK1 031 SK3
|
03/26/08 |
04/02/08 |
Closed |
Please verify that a waste line... |
| 032
|
03/26/08 |
04/02/08 |
Closed |
Is a plaster trap, per Henry ... |
| 033
|
03/26/08 |
03/27/08 |
Closed |
Since the east shaft above the ... |
| 034
|
03/26/08 |
04/02/08 |
Closed |
Please verify that the intake for... |
035
035 SK1 035 SK3
|
03/26/08 |
04/02/08 |
Closed |
Please verify that the developing... |
| 036
|
03/26/08 |
04/02/08 |
Closed |
Are there to be developing tanks... |
| 037
|
03/26/08 |
03/26/08 |
Closed |
Please provide templates for the... |
| 038
|
03/26/08 |
03/26/08 |
Closed |
Does the fume hood exhaust duct ... |
| 039
|
03/26/08 |
03/27/08 |
Closed |
Partition type 2 calls for ... |
| 040
|
03/27/08 |
04/01/08 |
Closed |
Please verify the size of the... |
| 041
|
03/27/08 |
04/01/08 |
Closed |
Please verify that the R/A... |
042
042 att |
03/28/08 |
04/01/08 |
Closed |
Is a 1” fiberglass return air ... |
| 043
|
03/28/08 |
04/01/08 |
Closed |
On opening #1300 the frame was ... |
044
044 att 1
044 att 2
|
03/28/08 |
04/23/08 |
Closed |
Schein drawing SPE.1, Plumbing ... |
| 045
|
03/28/08 |
04/01/08 |
Closed |
Sheet A600, Detail 10, Keynote 4... |
| 046
|
03/31/08 |
04/07/08 |
Closed |
acceptable to relocate the exhaust fan... |
| 047
|
03/31/08 |
04/07/08 |
Closed |
There is an existing access door located... |
048
048 att
|
04/02/08 |
04/02/08 |
Closed |
Millwork clarification |
| 048R1 |
04/03/08 |
04/04/08 |
Closed |
Millwork followup to RFI 048 response |
049
049 att
|
04/02/08 |
04/08/09 |
Closed |
Millwork submittal clarification |
| 050 |
04/04/08 |
04/07/08 |
Closed |
At the south wall in room 2121... |
| 051 |
04/04/08 |
04/04/08 |
Closed |
verify that all receptacles... |
| 052 |
04/04/08 |
04/23/08 |
Closed |
verify if the utility centers... |
| 053 |
04/09/08 |
04/10/08 |
Closed |
...jboxes for the projection screens are... |
| 054 |
04/09/08 |
04/11/08 |
Closed |
clarify detail 11/A602 for the curtain... |
| 055 |
04/14/08 |
04/23/08 |
Closed |
At compressor room 2109C, the vacuum... |
| 056 |
04/14/08 |
04/23/08 |
Closed |
The flush floor mounted receptacles... |
| 057 |
04/14/08 |
04/16/08 |
Closed |
Keyed note 25 on P102... |
| 058 |
04/14/08 |
04/16/08 |
Closed |
Please specify type of backflow... |
| 059 |
04/14/08 |
05/07/08 |
Closed |
Is there to be an auto film processor... |
| 060 |
04/14/08 |
04/23/08 |
Closed |
Is air required at the south wall... |
| 061 |
04/14/08 |
04/23/08 |
Closed |
Is air required at the east wall... |
| 062 |
04/14/08 |
04/23/08 |
Closed |
Is a backflow preventer required at each... |
| 063 |
04/14/08 |
|
Open |
Please provide a detail showing a ... |
| 064 |
04/14/08 |
04/23/08 |
Closed |
Please verify that the 7/8” gravity... |
| 065 |
04/14/08 |
04/23/08 |
Closed |
Please verify that the quad-plex as... |
| 066 |
04/14/08 |
04/23/08 |
Closed |
The quad-plexes at these locations... |
| 067 |
04/14/08 |
04/23/08 |
Closed |
Please provide details, dimensions... |
068
068 att
| 04/15/08 |
04/16/08 |
Closed |
The plans call for the water heater... |
069
069 att
|
04/15/08 |
04/21/08 |
Closed |
Please see sheet PG Sheet E203... |
| 070 |
04/15/08 |
04/16/08 |
Closed |
Please reference E203, note 3... |
| 071 |
05/01/08 |
05/14/08 |
Closed |
Please verify that, per Henry Schein’s ... |